Stage II Execution of the industrial prototype batch Individual Immediate Decontamination Kit.
Reported period: January – December 2017 Activities:
II.1. Creation of the pilot plant for manufacturing the industrial prototype
II.2. Preparation of technical procedures for the production of the industrial prototype
II.3. Acquisition of raw materials necessary for the execution of the industrial prototype batch and conducting conformity analyses for them
II.4. Execution of the industrial prototype batch – 200 pcs. TIDI
II.5. Analysis of the physicochemical properties of the decontamination solution and powder from the TIDI component.
Deliverables:
Following the research activities in Stage II, the following deliverables resulted, as provided for in the project implementation plan, in accordance with the funding request:
D3 – Industrial prototype pilot manufacturing line
D4 – Technical procedures for operating the pilot plant
D5 and D7 – Compliance report for the raw materials and decontamination solution included in the TIDI industrial prototype batch